Products used:
SyntryDeck
Freedomtuff™ 6160 epoxy primer
Freedomtuff 4300 Polyurethane
Freedomtuff 4000 Polyaspartic
Project description: CDW worked with freedom chemical to provide a durable and decorative flooring system for one of their clients. The client had used epoxy decorative flooring in the past but struggled with premature failure due to the lack of elasticity.
Application: the system was for storage units with both on grade and elevated flooring. The on grade storage units were over a concrete slab . The elevated units were over 1 ½” tong & groove plywood. Both the concrete slab and plywood were prepared according to freedom specifications. Freedomtuff™ 6160 epoxy primer was first applied at 5 mils. Freedomtuff stonegrip ™ was applied at 10 mils and decorative chips were broadcast to excess. The chips were raked smooth with a flat edge. Freedomtuff gripseal™ clear was then applied at 5 mils to create a durable easy to clean finish .
Results: upon completion of the project,the owners were very happy with the results. They liked the decorative finish, durability, and ease of cleaning. The client specified freedoms flooring system for 3 more jobs in 2012 & 2013.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
One California Plaza
Contractor: Angelus Waterproofing – Huntington Beach, CA
Job description: Multiple Water Features
Multi National Tank Rental Company – Houston, TX
Job description: iso tanks for transport of chemicals used for oil and gas drilling
University of Arizona Tucson
Job description: 36,000 sq.ft. Elevated deck over occupied space
Los Angeles Police Department
Contractor: Innovative Painting & Waterproofing
Job description: Flooring system for new LAPD Jail
Great Park
Sub Contractor: Mark Beamish Waterproofing
Job description: New Construction Project
Gold Coast Transit Authority
Client: Gold Coast Transit
Contractor: JP Rodriguez