PROJECT DETAILS:
System: Freedom Chemical Guardian-WF™
Completion Date: November 2023
New Construction or Renovation: This is a renovation project.
PROJECT TEAM:
Client: LADWP John Ferraro Building
Location: Los Angeles, California
Sub-Contractor: Best Contracting
Architect/Specifier/Consultant: D7 Consulting
PRODUCT DETAILS:
Guardian-Deck
FreedomTuff 6160
FreedomTuff 1095
FreedomTuff 2216
Solution: LADWP and D7 Consulting selected Freedom Chemical’s Guardian-WF, a system of fast set spray-applied coating to solve this problem. The original layer needed to be prepared by removing the entire membrane to expose the concrete deck and dry it out thoroughly. A new organic elastomer (rubber-like solid with elastic properties) was applied directly to the pool’s concrete surface. This new material is now resistant to chemical, heat, UV rays and abrasions. For example, Freedom Chemical’s Freedom Tuff 2216 is a fast setting, rapid curing, two component aromatic polyurea. It is used as a general purpose protective coating that is flexible, abrasion resistant, and impact resistant.
Challenge: In recent years the pool had begun to experience a deterioration of its lining, which had begun to leak water into the subterranean floors of the building. The pool can hold 1.2 million gallons of water and the fountains are able to pump and circulate 22,000 gallons of water per minute and the inner jets can spray water 30 feet high.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
University of Utah
Contractor: Protech Coatings inc.
Job description: Concrete water tanks for leeds certified building
UCI Humanities Hall
Sub Contractor: Innovative Painting and Waterproofing
Job description: Podium Deck Waterproofing
Dolphins at Long Beach-CA Port
Client: Structural - City of Long Beach
Sub-Contractor: Mark Beamish Waterproofing
Equinox Fitness Club
Contractor: Mark Beamish Waterproofing
Job description: 22,000 sq.ft. Elevated deck over occupied space
University of Arizona Tucson
Job description: 36,000 sq.ft. Elevated deck over occupied space
Center for the Arts
Sub Contractor: Innovative Painting & Waterproofing
Job description: Renovation Project