Products used:
Freedomtuff 2202 polyurea
freedomtuff 6160 epoxy primer
freedomtuff 5145 polyurea caulking
Project description: In 2014 the city of beverly hills, california renovated their water feature. They wanted to expand the size and upgrade the plant life and vegetation in the water feature. They were looking for a durable liner that could hold up to plant growth as well as hold up to the ground movement in the area.
Application: The concrete was shot blasted to spec. The cracks were filled with freedomtuff 5145 polyurea caulking. Freedomtuff 6160 epoxy primer was applied at 5 mils. Freedomtuff 2202 was applied at 100 mils.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
Broadcom Underground Tunnel
Contractor: Mark Beamish Waterproofing
Job description: Underground tunnel for pedestrian traffic
Elevate 5504 Harbor Blvd
Consultant: D7 Consulting – Joe Daniels
Job description: Waterproofing
Dolphins at Long Beach-CA Port
Client: Structural - City of Long Beach
Sub-Contractor: Mark Beamish Waterproofing
2Cal Tower
Client: CIM Group
Sub-Contractor: Innovative Painting & Waterproofing
Crystal Cathedral
Client: Roman Catholic Diocese of Orange
Contractor: Innovative Painting & Waterproofing
Amusement Park
Sub Contractor: Innovative Painting & Waterproofing
Job description: Renovation Project











