Products used:
FreedomTuff 6160 Epoxy Primer
FreedomTuff FT-4000 Polyaspartic
Job Description: 36,000 sq.ft. elevated deck over occupied space
Project Description: In summer of 2011 University of Arizona approached Freedom Chemical Corporation concerning the elevated space that was above their basketball arena Mckale Center. This area has an extensive amount of foot traffic every year during the basketball season. As a result the current topcoat was showing serious signs of discoloration and loss of non-skid properties. U of A wanted to coat over the existing polyurea waterproofing membrane with a high abrasion resistant coating with great uv stability that could stand up to the high traffic and intense Arizona sun light.
Application: The area was cleaned with high pressure (3000 psi) water wash and degreaser. The FT 6160 primer was used at a rate of 300 sq.ft. / gallon and diluted with 20% acetone to insure optimum adhesion to the substrate in the evenings. A 30 mesh washed rounded aggregate was broadcast in the FT 6160 epoxy primer before cure at a rate of 0.25 lbs per sq.ft. In the early morning to avoid the direct July sunlight and heat the FT-4000 Polyaspartic (grey) was applied at a rate of 250 sq.ft. per gallon.
Results: After 2 full summers in the Arizona sun the FT-4000 Polyaspartic grey coatings is show no signs of discoloration or premature wear. Having going through 2 basketball seasons with the foot traffic and small vehicular traffic the non-skid properties remain the same as day one proving out the durability of the FT-4000 Polyaspartic and its ability to hold in place the non skid aggregate over time.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
Great Park
Sub Contractor: Mark Beamish Waterproofing
Job description: New Construction Project
Kaiser Permanente Baldwin Park
Contractor: Angelus Waterproofing
Job description: 32,000 sq.ft. reflection pond above occupied space
2Cal Tower
Client: CIM Group
Sub-Contractor: Innovative Painting & Waterproofing
Orange County Sherriff
Contractor: Innovative Painting & Waterproofing
Job description: inmate showers
University of California Los Angeles – California
Job description: cooling towers
US Coast Guard Facility
Sub Contractor: Innovative Painting and Waterproofing
Job description: Renovation Project