Gallery
Project Description
Recently the Los Angeles Music Center underwent a $41 million renovation, part of which was the fountain the plaza of the center. Freedom® Chemical Corporation was contracted to supply the materials for the waterproofing the outdoor fountain.
Innovative Painting & Waterproofing shot blasted the concrete fountain between CSP 3-7 to remove any of the previous coating and to prepare the surface for the FreedomTuff® 6160 epoxy primer, the fountain was then sprayed with FreedomTuff® 2202 polyurea. The polyurea gave the fountain a very durable and seamless waterproof membrane.
The results of the use of FreedomTuff® Guardian-WF™ give this beautiful fountain problem free use for years to come.
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
West Hollywood Gateway Mall
Contractor: Innovative Painting and Waterproofing
Job description: Heavy Duty Loading Dock
Hudson Pacific Properties
Client: Hudson Pacific Properties
Sub-Contractor: Hudson Pacific Properties
Corporate Point West Hills – California
Job description: cooling towers
One California Plaza
Contractor: Angelus Waterproofing – Huntington Beach, CA
Job description: Multiple Water Features
LADWP John Ferraro Building
Client: LADWP John Ferraro Building
Sub-Contractor: D7 Consulting
Westfield
Contractor: Angelus Waterproofing
Job description: Underground tunnel for vehicular traffic












