Project description: in 2010 corporate point wanted to recoat the two main cooling tower basins that service the 10 building campus that is on 80 acres. Since the product was being done during the summer months the temperatures were reaching the 90’s and they could not have much down time with any one unit. As a result they needed a coating solution that would not require extended down time and one they could stage the down time of the two units without putting too much load on one unit while the other was down. As a result of the requirements they chose the the freedomtuff polyureas for their durability and fast return to service application.
Application: the area was cleaned with high pressure (5000 psi) water wash which partially removed the existing epoxy coating. The remaining epoxy coating was removed with power tools and the concrete was abraded to achieve sufficient profile. Freedomtuff 6160 epoxy primer was applied at 5 mils. A 20 grit aggregate was lightly thrown onto the wet primed walls to allow for maximum mechanical adhesion. Freedomtuff 2202 was applied at 100 mils.
Results: the client was able to shut down one unit at a time for only 3 days while the towers were prepped, primed and sprayed with polyurea. This allowed for sufficient cooling of the 10 building campus during the work. When it was done the client commented how easy the freedomtuff 2202 was to clean and that their maintenance scheduled cleanings where a “piece of cake”!
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
Los Angeles Music Center
Consultant: D7 Consulting – Joe Daniels
System: FreedomTuff® Guardian-WF™
Westfield
Contractor: JP Rodriquez
Job description: 24 Hour Fitness pool deck and sports court
Department of Defense
Contractor: JP Rodriguez
Job description: flooring system for 32 barracks 160,000 + sq.ft.
Equinox Fitness Club
Contractor: Mark Beamish Waterproofing
Job description: 22,000 sq.ft. Elevated deck over occupied space
Hudson Pacific Properties
Client: Hudson Pacific Properties
Sub-Contractor: Hudson Pacific Properties
Orange County Sherriff
Contractor: Innovative Painting & Waterproofing
Job description: inmate showers