PROJECT DETAILS
System: Freedom Chemical Guardian-RT
Completion Date: September 2025
New Construction or Renovation: New Construction
PROJECT TEAM
Client: CPKC Railways
Location: Kansas City, Missouri
Sub-Contractor: Albers Industrial
PRODUCT DETAILS
FT‑6160 Epoxy Primer – High‑performance primer formulated to maximize adhesion to prepared steel and concrete substrates.
FT‑2202 BMW (Bridge Membrane Waterproofing) – Rapid‑curing waterproofing membrane that meets ARMEA requirements.
FT‑7000 VBM (Volumetric Ballast Mat) – Expanding Polyurea Technology designed for ballast and impact protection, adding structural resilience to the Guardian‑RT™ system.
SOLUTION
The state of rail‑bridge infrastructure in Missouri and across the U.S. underscores the urgency behind this project. In Missouri alone, there are nearly 24,647 bridges statewide. Of these, more than 1,300 are classified as “structurally deficient,” meaning one or more critical components are rated in poor or worse condition.
In this project, the Guardian‑RT™ system (comprising FT‑6160 Epoxy Primer, FT‑2202 Polyurea, and FT‑7000 Polyurea Volumetric Ballast Mat) was chosen to restore and protect the bridge deck surfaces from water infiltration, freeze–thaw damage, and ballast infiltration amongst other threats.
The Freedom Guardian RT 6160 epoxy primer was installed after the concrete decks were mechanically cleaned and prepared, then tested for adhesion in accordance to AREMA guidelines Chapter 8, Part 29. Soon after, the FT-2202 BMW (Bridge Membrane Waterproofing), an extremely tough and fast setting (10 seconds) spray applied waterproofing membrane was installed to offer long design life and create a seamless waterproofing membrane to the bridge deck. Lastly the BMW was protected by Freedom’s Patterned Spray Applied VBM (Volumetric Ballast Mat) which instantly rises when sprayed to create a thick and super tough protective ballast mat that doesn’t absorb water and tuff to protect against ballast and track maintenance. Freedom Guardian RT was a key component in ensuring the long-term design life of the CPKC rail bridge with many key assets:
• Provides a seamless, elastomeric barrier that prevents water and chloride ingress into the bridge deck concrete or steel deck elements.
• Offers adhesion and protection under heavy rail load cycles, minimizing micro‑cracking and delamination at the substrate interface.
• Delivers rapid cure and return‑to‑service (RTS) times to reduce track outage durations and operational disruptions.
• Adds an impact/ballast‑protection layer (via the FT‑7000 VBM) to shield waterproofing under the ballast load environment.
CHALLENGE
The CPKC rail bridge construction faced significant challenges, including tight work scheduling, cold weather conditions, and the need for durable waterproofing. Freedom’s Guardian RT system proved to be the perfect choice:
Fast Installation: Spray-applied and quick-curing, Guardian RT enabled crews to meet aggressive timelines without compromising quality.
Cold Weather Application: Engineered to cure in cold temperatures, it allowed uninterrupted progress during fluctuating temperatures.
Rail Specific Durability: Designed for ballast decks and compliant with AREMA standards, it provided long-term protection against water and abrasion.
CPKC Compliance: Met all safety, QA/QC, and design requirements, streamlining approvals and minimizing delays.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
Los Angeles Music Center
Consultant: D7 Consulting – Joe Daniels
System: FreedomTuff® Guardian-WF™
Wheelock Stadium
Client: Riverside Community College
Sub-Contractor: Innovative Painting & Waterproofing
Food Processing Plant – Texas
Contractor: IMMCO INC
Job description: Chiller rooms and food processing areas
Pilgrim’s Pride
Consultant: D7 Consulting – Joe Daniels
System: FreedomTuff® Guardian-WF™
Elevate 5504 Harbor Blvd
Consultant: D7 Consulting – Joe Daniels
Job description: Waterproofing
Port Covington
Client: Port Covington Sanitary Containment
Sub-Contractor: SprayTeq LLC