PROJECT DETAILS:
Completion Date: 11.24.21
New Construction or Renovation: This is a renovation project
PROJECT TEAM:
Client: US Coast Guard Facility
Location: California
General Contractor: Don Dancey
Sub Contractor: Innovative Painting and Waterproofing
PRODUCT DETAILS:
FT-6160 Primer FreedomTuff 6160
FT-2243 CR FreedomTuff 2243 CR
Solution: Project was done using chemical-resistant polyurea. This technology offered a variety of benefits for both applicator and also for the client. Spray techniques for fast-cure plural spray-applied coating application. For example, Freedom Chemical’s Freedom Tuff 6160 is a two component 100% solids epoxy primer designed to treat new and existing concrete, masonry and wood. Freedom Chemical’s Freedom Tuff 2243 CR is a two-component chemical resistant spray applied 100% pure aromatic polyurea coating. Used on vertical and horizontal surfaces and forms a continuous seamless membrane of a desired thickness on concrete, metal, fiberglass and geotextile fabrics.
Challenge: Restoration of a failed secondary containment lining system for fuel storage tanks. The project consisted of two 8,000-square-foot containment basins for 750,000 gallon fuel storage tanks. It took the contractor five weeks to complete, including removal of existing urethane coating system, concrete prep, sealant replacement, and installation of new 80-mil liquid-applied membrane liner.
The fueling facility was able to have the containment areas resurfaced with minimal downtime, no dust, fumes or overspray
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
Amusement Park – Anaheim
Contractor: Innovative Painting & Waterproofing
Job description: High wear decorative flooring system
Food Processing Plant – Texas
Contractor: IMMCO INC
Job description: Chiller rooms and food processing areas
Renaissance Arts Academy
Contractor: Mark Beamish Waterproofing
Job description: Parking Deck over occupied space
Los Angeles Dodgers
Contractor: JP Rodriguez
Job description:Durable flooring solution on an upper deck area that would also be waterproof.
5507 Hollywood Blvd
Contractor: Mark Beamish Waterproofing
Job description: Parking Garage Over Occupied Space
UCI Humanities Hall
Sub Contractor: Innovative Painting and Waterproofing
Job description: Podium Deck Waterproofing