Consultant: D7 Consulting – Joe Daniels
Contractor: Systems Waterpoofing
Job Description: Podium Deck Between Slab Waterproofing Over Existing Membrane and Planters
Products Used:
GUARDIAN-PD™
FREEDOMTUFF™ 2202 POLYUREA WITH GEOTEXTILE
FREEDOMTUFF™ 6160 PRIMER
Project Description: Elevate at 5504 Harbor Blvd. in Costa Mesa, CA was being remolded to make the office building more modern and help bring in new tenants. The exterior podium deck which is over parking and office space was leaking. ADDITIONALLY, the remodel plans included adding more drains and green space to the ~35,000 sqft space.
Application: the FreedomTuff™ 2202 polyurea and geotextile application was chosen to eliminate the need for removal of the existing membrane. This saved the client time and money. A 10 oz non-woven geotextile was used which had a barned side to help improve the coverage of the polyurea. FreedomTuff™ 2202 Polyurea was applied at a rage of 5 gallons per 100 sqft (80 mils) over the geotextile up to parapet walls and the slab of the building. FT-6160 Epoxy primer was used at 0.5 gallons per 100 sqft (8 mls) over the concrete parapets and slab and FreedomTuff™2202 was applied to the primer to secure the system including fabric in place.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
Los Angeles Dodgers
Contractor: JP Rodriguez
Job description:Durable flooring solution on an upper deck area that would also be waterproof.
Multi National Tank Rental Company – Houston, TX
Job description: iso tanks for transport of chemicals used for oil and gas drilling
US Coast Guard Facility
Sub Contractor: Innovative Painting and Waterproofing
Job description: Renovation Project
Crystal Cathedral
Client: Roman Catholic Diocese of Orange
Contractor: Innovative Painting & Waterproofing
University of Arizona Tucson
Job description: 36,000 sq.ft. Elevated deck over occupied space
Westfield
Contractor: JP Rodriquez
Job description: 24 Hour Fitness pool deck and sports court